Pröbstel Apparatebau GmbH – proven quality in the production of clear extraction system for SBR purification plants!
 

<< last picture

2. Start of the extraction process:

The extractor is lowered by the winch. A flexible flap prevents swimming sludge from getting into the extractor while this is being lowered. The intake element floats on the water. The position of the intake opening is approximately 30 cm below the water level.

next picture >>